Note to Teams

A number of the teams at the E-Day scrimmage did not know that the “Pump System” was supposed to be attached to the WALL of the field via Dual Locks as shown below:

(as per HYDRO DYNAMICS Field Setup Guide page 10)

This actually makes M03 – Pump Addition easier so make sure you do this on your fields.

This entry was posted in FLL Memphis News, FLL News. Bookmark the permalink.